
Frame from "Assembly Special Work Session of April 16, 2026" · Source
Borough proposes $580K budget with new staff, building upgrades
The Kodiak Island Borough Assembly reviewed the proposed fiscal year 2027 budget Wednesday night. The plan includes new staff positions, energy cost savings, and accessibility improvements.
The budget adds a construction management position to the engineering department to handle hospital projects. Borough Manager Aimee Williams said the position will pay for itself over time.
"We are looking to add another person to the projects office to assist with construction management and the handling of the additional hospital projects," Williams said. "But in the long run, I think we'll save that fund way more than that position costs."
The borough has nearly eliminated its reliance on diesel heating at the borough building by switching to an electric boiler. Assembly Chair Scott Johnson noted the timing of the switch.
"We use the electric boiler almost exclusively," Johnson said. "And how lucky are we right now when you look at the price of diesel that we don't have to be completely reliant on that."
The budget includes $147,000 for an ADA accessibility project at the borough building entrance. Johnson said the need became clear after watching residents with mobility devices struggle to enter the building.
"We are planning an entryway project to make our sidewalks, our door, and our entry ADA to better meet the needs of the community," Johnson said. "It's something I don't really think about until I saw someone with a walker with wheels try to get in our building, and it was pretty bad."
The project will grind down high sections of sidewalk and add cement to low areas. The doors alone carry a significant cost. Any major changes will require installing an exterior button to open the doors automatically.
Insurance costs are dropping by more than $40,000. The borough earned prevention credits through maintenance staff conducting self-evaluations of borough buildings. Williams said the Alaska Rural Property Insurance Association had originally planned to visit and appraise all insured buildings across the state but shifted to a prevention credit system instead.
Maintenance staff completed evaluations at multiple locations. They checked the Port Lions School during a fire project visit and other rural schools when staff traveled for other purposes.
The engineering and facilities department budget shows lower-than-expected salary expenditures for fiscal year 2026. The engineering facilities director position has been vacant for about eight months. Williams said some employees received additional pay to cover extra duties, but the main position salary was not paid out.
The department also lacks an environmental specialist, further reducing salary costs. Williams said the borough has been trying to recruit for the position, including considering a candidate from Wyoming. The borough could not justify the $6,000 relocation cost.
This article was drafted with AI assistance and reviewed by editors before publishing. Every claim can be verified against the original transcript. If you spot an error, let us know.
Related Coverage
Senate panel approves $4.2 billion health budget with Medicaid rate hikes
Alaska News · 4d ago · 2 views · 73% match
Alaska Marine Highway board seeks public input on ferry system budget
Alaska News · 1w ago · 3 views · 73% match
Homer Council to Vote on HART Sales Tax Renewal for November Ballot
Alaska News · 2d ago · 2 views · 72% match
Alaska Overhauls School Construction Funding to Help Rural Districts Compete
Alaska News · 2w ago · 1 views · 72% match
House Finance considers multi-year school funding averaging bill
Alaska News · 1d ago · 1 views · 72% match
Comments
Sign in to leave a comment.
No comments yet. Be the first to share your thoughts.